Monday, June 17, 2013

PHOTO SHOOT: Day 1—Wallenda Grand Canyon Cable Installation: Mainland Site Preparation


Day one of the cable install for Nik Wallenda's high-wire tightrope walk over the Grand canyon found crew members unpacking, assembling, and positioning critical hardware and equipment on the ‘mainland’ side of the job site with the project engineers in attendance.

Above: A view of the primary work site perched on the south rim of the Little Colorado River.

Thursday, May 2, 2013

PHOTO SHOOT CONFIRMED: Cable Installation for Wallenda Grand Canyon Walk

On June 23, 2013 in a remote corner of the Grand Canyon, 1500 feet above the Little Colorado River, Nick Wallenda will attempt his highest high-wire walk to date.  During his untethered journey, Nik will be contending with hard to predict winds as well as constant strong updrafts and downdrafts.

Saturday, April 27, 2013

DISPLAY PRINTS: Brand Imagery Makes an Impact at the Office


This post highlights a portion of the install and display of more than 150 large-format brand photographs throughout several corporate offices for a customer.

Above: Bob Robinson of Out Of The Woods Woodworking installs ten three-foot-square prints in a large conference room area.

Thursday, March 7, 2013

PHOTO CONTEST: Award Winning Cable Shot


This photograph took first prize in the Power Delivery Design Conference 2013 Photo Contest.

Thursday, November 15, 2012

PHOTO SHOOT: Hurricane Sandy—Emergency Power Restoration

Hurricane Sandy was one of the largest most damaging storms in our nation’s history. I was hired to photograph several emergency crews working to restore power in the lower Hudson Valley and on Long Island over several days in the aftermath of the storm. This post’s images highlight those efforts.

Wednesday, October 3, 2012

DESIGN: Wind Division Brochure



I developed this simple 8-1/2 x 11 trifold brochure for O’Connell Electric’s Wind Division to use as general handouts.  The piece leverages brand images I have been taking for the company over the last several years and compliments a larger more comprehensive brochure I put together for the company which was targeted toward pre-qualified prospects.

Saturday, August 18, 2012

PHOTO SHOOT: UB Stadium Lighting Replacement Project

Above: Hohl Industrial workers use an acetylene torch to dismantle one of the four original 186 foot light towers at University of Buffalo’s UB Stadium. I received called the day before the last original tower was to be dismantled and the new tower erected, hired to capture iconic brand imagery from the project.